Answers on sizing, cost, permits, flood zones, financing, warranties, and installation from Ready Power USA.
THE ASSESSMENT & SALES PROCESS
A portable generator is a temporary workaround that requires manual setup, gasoline refueling, and extension cords. A home standby generator is permanently installed, starts automatically during outages, and can power your full home including HVAC, refrigeration, security systems, and medical devices. For Gulf South homeowners facing hurricanes and grid outages, standby generators provide true unattended protection.
A Ready Power employee visits your home for a full evaluation of your electrical panel, gas service, generator placement, flood zone requirements, and load calculation. We determine what size generator you need, identify any upgrades required, and provide clear pricing with no surprises.
Most homes in Louisiana, Mississippi, and Alabama need between 16 kW and 26 kW depending on HVAC systems, appliances, and electrical demand. Proper sizing requires a load calculation, not square footage alone. We evaluate your actual usage and fuel source before recommending a unit.
Installed standby generators typically range from $9,000 to $28,000+ depending on generator size, gas line routing, panel condition, flood zone elevation requirements, and site conditions. Pricing includes generator, pad, transfer switch, electrical work, gas piping, permitting, and startup.
Yes. HOA communities may have additional requirements for placement, screening, aesthetics, and noise. Ready Power regularly works in HOA communities and helps homeowners navigate approvals and restrictions before installation.
In most cases, yes. Some homes use a whole-home transfer switch, while others use Smart Management Modules to stagger high-demand loads. This often allows full-home coverage without requiring an oversized generator.
Older or unsafe electrical panels may need replacement before generator installation. If required, we identify that during the assessment and include the work in your quote so there are no surprises later.
INSTALLATION
Most home standby generator installations are completed in one day. Larger systems or homes requiring major gas or electrical upgrades may take two days.
After signing, we order the generator, submit permits, coordinate any utility requirements, and schedule your install date. Typical timelines are 3 to 6 weeks depending on permits and equipment availability.
Proper installation includes a level pad, correctly sized transfer switch, properly sized gas line, licensed electrical work, full startup testing, and documentation. Poor installation can lead to failures during outages.
Placement depends on manufacturer clearances, local code, flood zone requirements, HOA rules, and service access. We determine the correct location during your assessment.
Generators are typically installed on a poured concrete pad or engineered composite pad. Flood zone homes may require an elevated steel or aluminum stand.
If your property is in a FEMA flood zone, the generator must be elevated above required flood levels. We calculate required stand height, coordinate documentation, and build it into the project scope.
If your home does not have natural gas, the generator can run on propane. We coordinate with your propane provider, install the gas piping, and size the tank appropriately.
Yes. We disconnect, remove, haul away, and replace aging generators. We also evaluate whether your existing transfer switch, gas line, or pad can be reused.
PERMITS & COMPLIANCE
Most home standby generator installations are completed in one day. Larger systems or homes requiring major gas or electrical upgrades may take two days.
After signing, we order the generator, submit permits, coordinate any utility requirements, and schedule your install date. Typical timelines are 3 to 6 weeks depending on permits and equipment availability.
Proper installation includes a level pad, correctly sized transfer switch, properly sized gas line, licensed electrical work, full startup testing, and documentation. Poor installation can lead to failures during outages.
Placement depends on manufacturer clearances, local code, flood zone requirements, HOA rules, and service access. We determine the correct location during your assessment.
Generators are typically installed on a poured concrete pad or engineered composite pad. Flood zone homes may require an elevated steel or aluminum stand.
If your property is in a FEMA flood zone, the generator must be elevated above required flood levels. We calculate required stand height, coordinate documentation, and build it into the project scope.
If your home does not have natural gas, the generator can run on propane. We coordinate with your propane provider, install the gas piping, and size the tank appropriately.
Yes. We disconnect, remove, haul away, and replace aging generators. We also evaluate whether your existing transfer switch, gas line, or pad can be reused.
WARRANTY & MAINTENANCE
Most home standby generator installations are completed in one day. Larger systems or homes requiring major gas or electrical upgrades may take two days.
After signing, we order the generator, submit permits, coordinate any utility requirements, and schedule your install date. Typical timelines are 3 to 6 weeks depending on permits and equipment availability.
Proper installation includes a level pad, correctly sized transfer switch, properly sized gas line, licensed electrical work, full startup testing, and documentation. Poor installation can lead to failures during outages.
Placement depends on manufacturer clearances, local code, flood zone requirements, HOA rules, and service access. We determine the correct location during your assessment.
Generators are typically installed on a poured concrete pad or engineered composite pad. Flood zone homes may require an elevated steel or aluminum stand.
If your property is in a FEMA flood zone, the generator must be elevated above required flood levels. We calculate required stand height, coordinate documentation, and build it into the project scope.
If your home does not have natural gas, the generator can run on propane. We coordinate with your propane provider, install the gas piping, and size the tank appropriately.
Yes. We disconnect, remove, haul away, and replace aging generators. We also evaluate whether your existing transfer switch, gas line, or pad can be reused.
FINANCING
Most home standby generator installations are completed in one day. Larger systems or homes requiring major gas or electrical upgrades may take two days.
After signing, we order the generator, submit permits, coordinate any utility requirements, and schedule your install date. Typical timelines are 3 to 6 weeks depending on permits and equipment availability.
Proper installation includes a level pad, correctly sized transfer switch, properly sized gas line, licensed electrical work, full startup testing, and documentation. Poor installation can lead to failures during outages.
Placement depends on manufacturer clearances, local code, flood zone requirements, HOA rules, and service access. We determine the correct location during your assessment.
Generators are typically installed on a poured concrete pad or engineered composite pad. Flood zone homes may require an elevated steel or aluminum stand.
If your property is in a FEMA flood zone, the generator must be elevated above required flood levels. We calculate required stand height, coordinate documentation, and build it into the project scope.
If your home does not have natural gas, the generator can run on propane. We coordinate with your propane provider, install the gas piping, and size the tank appropriately.
Yes. We disconnect, remove, haul away, and replace aging generators. We also evaluate whether your existing transfer switch, gas line, or pad can be reused.
SERVICE AREA
Most home standby generator installations are completed in one day. Larger systems or homes requiring major gas or electrical upgrades may take two days.
After signing, we order the generator, submit permits, coordinate any utility requirements, and schedule your install date. Typical timelines are 3 to 6 weeks depending on permits and equipment availability.
Proper installation includes a level pad, correctly sized transfer switch, properly sized gas line, licensed electrical work, full startup testing, and documentation. Poor installation can lead to failures during outages.
Placement depends on manufacturer clearances, local code, flood zone requirements, HOA rules, and service access. We determine the correct location during your assessment.
Generators are typically installed on a poured concrete pad or engineered composite pad. Flood zone homes may require an elevated steel or aluminum stand.
If your property is in a FEMA flood zone, the generator must be elevated above required flood levels. We calculate required stand height, coordinate documentation, and build it into the project scope.
If your home does not have natural gas, the generator can run on propane. We coordinate with your propane provider, install the gas piping, and size the tank appropriately.
Yes. We disconnect, remove, haul away, and replace aging generators. We also evaluate whether your existing transfer switch, gas line, or pad can be reused.
ABOUT READY POWER
Most home standby generator installations are completed in one day. Larger systems or homes requiring major gas or electrical upgrades may take two days.
After signing, we order the generator, submit permits, coordinate any utility requirements, and schedule your install date. Typical timelines are 3 to 6 weeks depending on permits and equipment availability.
Proper installation includes a level pad, correctly sized transfer switch, properly sized gas line, licensed electrical work, full startup testing, and documentation. Poor installation can lead to failures during outages.
Placement depends on manufacturer clearances, local code, flood zone requirements, HOA rules, and service access. We determine the correct location during your assessment.
Generators are typically installed on a poured concrete pad or engineered composite pad. Flood zone homes may require an elevated steel or aluminum stand.
If your property is in a FEMA flood zone, the generator must be elevated above required flood levels. We calculate required stand height, coordinate documentation, and build it into the project scope.
If your home does not have natural gas, the generator can run on propane. We coordinate with your propane provider, install the gas piping, and size the tank appropriately.
Yes. We disconnect, remove, haul away, and replace aging generators. We also evaluate whether your existing transfer switch, gas line, or pad can be reused.